Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />PRODUCTS: <br /> <br />In Phase 1: <br /> <br /> <br />1. Estimated existing and potential irrigated lands and <br /> <br /> <br />location of potential M & I uses in the study area to <br /> <br /> <br />be supplied from the project. <br /> <br />2. Comparative tabulations of existing and proposed water <br />uses from previous project studies prepared by the <br />USBR and Western Engineers, Inc., and other available <br />sources. <br /> <br />3. Flow chart portraying projected future water demands by <br /> <br /> <br />type, time and location of use for up to three <br /> <br /> <br />de~elopment scenarios. <br /> <br />4. Approved schedules of existing and projected future <br />water demands to be supplied from the San Miguel <br />Project. <br /> <br />5. Memorandum summarizing Phase 1 task in form of section <br />for Interim Report. <br /> <br />A-36 <br />