My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00257
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00257
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153418
Contractor Name
San Miguel Water Conservancy District
Water District
0
County
San Miguel
Bill Number
XB 99-999
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
77
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />~~ Consult with local irrigators to assess existing crop- <br />ping patterns. Assess the potential for alternative <br /> <br />crops based on data developed from Contractor's <br /> <br />previous <br /> <br />experience <br /> <br />in <br /> <br />similar <br /> <br />high <br /> <br />elevation <br /> <br />irrigation areas. <br /> <br />4. Research crop consumptive use estimates previously <br /> <br />prepared for the study area or for the studies of <br /> <br />similar areas. <br /> <br />Evaluate attainable <br /> <br />water demands <br /> <br />for both existing <br /> <br />irrigation effi- <br />farm and~ersio~ <br />and alternative <br /> <br />ciencies and <br /> <br />estimate irrigation <br /> <br />-'~------ -- <br /> <br />cropping patterns. <br />--- ---- <br /> <br />(\ <br />I , <br />~/ In consultation with the CWCB and SMWCD, establish <br /> <br />acceptable irrigation supply shortage criteria for the <br /> <br />:' <br /> <br />project to be used in the system operating evaluations <br /> <br />under Task 7. <br /> <br />() <br /> <br />using population projections and industrial development <br />potential obtained in step 1 and data from previous <br /> <br />studies compiled in Task 1, estimate the present and <br /> <br />future demands for M & I water supplies in the project <br /> <br />area for up to three development scenarios. <br /> <br />7. Prepare a schedule of present and future demands for <br /> <br />project water supplies in the study area for up to <br /> <br />I <br /> <br /> <br />A-34 <br />
The URL can be used to link to this page
Your browser does not support the video tag.