Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Irrigation consumptive use will be estimated for the first- <br /> <br />phase evaluations based on review of available data from <br /> <br />previous studies in the project and similar areas. specific <br /> <br />consumptive use estimates will be prepared for the more <br /> <br />detailed feasibility evaluations of the selected final <br /> <br />project configurations in Phase 2. <br /> <br />METHODOLOGY: <br /> <br />In .Phase 1: <br />'/// <br /> <br />{7/ Consult with state, San Miguel and Montrose County <br /> <br /> <br />Officials, the CWCB staff, the SMWCD, and other <br /> <br />appropriate entities to obtain their views of future <br /> <br />development in the study area. Estimate the associated <br /> <br />future water needs in the study area for a ma}i:~m~ Q,f <br />three levels of development. <br /> <br />-------- <br /> <br />2. Review previous soil classification surveys of the USER <br /> <br />and <br /> <br />SCS to <br /> <br />estimate existing irrigable lands, new <br /> <br />lands, and <br /> <br />lands <br /> <br />formerly, but not presently, <br /> <br />irrigated, in the project area, including lands in West <br /> <br />Lilylands. <br /> <br />A-33 <br />