Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Implementation Schedule <br /> <br />The following schedule is proposed for implementation of the project as described above: <br /> <br />Complete Final Design <br />Order Pneumatic Structures <br />Award Construction project <br />Start Construction <br />Construction Completed <br />Project is Operational <br /> <br />09-10-1998 <br />09-23-1998 <br />09-29-1998 <br />10-06-1998 <br />12-05-1998 <br />12-10-1998 <br /> <br />Social, Economic and Physical Impacts <br /> <br />The project is not expected to have any significant social impacts. <br /> <br />Although shareholders in the District will be confronted with increased assessments for <br /> <br /> <br />construction and loan repayment costs, the project will have a long term positive impact <br /> <br /> <br />on the local farm community; by assuring i1n annual diversion of approximately 45,000 <br /> <br /> <br />acre-feet of water annually for irrigation of shareholders crops. <br /> <br />The Project will have no significant physicill impacts once the construction is completed, <br /> <br /> <br />The new proposed structure will be similar in size to the previous structure, <br /> <br />8 <br />