My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153827 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153827 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/27/2011 11:03:22 AM
Creation date
10/5/2006 11:45:47 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153827
Contractor Name
Julesburg Irrigation District
Contract Type
Loan
Water District
64
County
Logan
Bill Number
EIA
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
79
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Water Rights <br />The subject of Water Rights is discussed in detail in another Feasibility Report filed in <br />July of 1991, by W. W. Wheeler and Associates, and is on file at the District office in <br />Julesburg, Colorado. <br /> <br />In 1996 a total of 44,000 acre-feet was diverted through the existing diversion structure <br />into Harmony NO.1 Ditch. A total of 21 ,400 acre-feet was placed in storage in Julesburg <br />Reservoir, according to the State Engineers Office records, See Appendix C, <br /> <br />Cost Estimate <br /> <br />The estimated total project cost is $ 680,625.00. Project planning and engineering design <br />will be provided by Zoyiopoulos and Associates, Inc. <br /> <br />Item <br />Construction Cost <br />Engineering Fee <br />5% Contingency <br /> <br />Total Project Cost <br /> <br />Estimated Cost <br />$ 599,210,00 <br />$ 49,100,00 <br />$ 32,315,00 <br /> <br />$ 680,625,00 <br /> <br />Please refer to Appendix I, for a detailed Item by Item cost estimate for the above <br /> <br /> <br />mentioned Referendum 8, and also the other alternative cost estimates, <br /> <br />7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.