Laserfiche WebLink
<br />12 <br /> <br />thus the proJect evaluation will be limited <br />to irrigation only. <br /> <br />, ' <br /> <br />Cost: <br /> <br />Engineering - 24 hours @ e45.00 <br /> <br />e 1.080.00 <br /> <br />Report Preparation 70.00 <br /> <br />Subtotal $ 1,150.00 <br /> <br />CHAPTER VIII: FINANCIAL PROGRAM <br /> <br />Scope: This chapter will address items (c) and (d) <br />0% the CIIICB "Guidelinea" to demonstrate the <br />proJect %easibility. An explanation 0% <br />NPIC's method 0% providing revenues and a <br />detailed schedule will be developed to show <br />NPIC's financial program to payout the <br />proJect coats. <br /> <br />Cost: <br /> <br />Engineering - 20 hours @ $45.00 <br /> <br />e <br /> <br />900.00 <br /> <br />Report Preparation <br /> <br />75.00 <br /> <br />Subtotal $ <br /> <br />975.00 <br /> <br />GRAND TOTAL <br /> <br />S23.440.00 <br />