Laserfiche WebLink
<br />, c <br /> <br />, <br />. <br /> <br />" <br /> <br />FEE SCHEDULE <br /> <br />ProJect Manager - Duane H. Smith <br /> <br />Geotechnical Engineer. P.t. - James R.Dubler <br /> <br />ProJect Engineer. P.E. - ~ichael Keegan <br /> <br />ProJect Surveyor. R.L.S. ~ David Poeschl <br /> <br />Senior Engineer/Geologist - Thomas Finley <br /> <br />Junior Engineer, E.I.T. - Catherine Kuchta <br /> <br />Designer-Draftsman - Erni~ Waterman <br />Robel:'t Sorensen <br />Eugel1e Limon <br /> <br />Laboratory Technician - D4n Krigbaum <br />St:.eve Biegler <br /> <br />Clerk/Typist - Jere Holme~ <br /> <br />Two-Man Survey Crew <br /> <br />Three-Msn Survey Crew <br /> <br />i <br /> <br />S 45.00/hour <br /> <br />45.00/hour <br /> <br />40.00/hour <br /> <br />40.00/hour <br /> <br />34.00/hour <br /> <br />30.00/hour <br /> <br />28.00/hour <br /> <br />28.00/hour <br /> <br />24.00/hour <br /> <br />54.00/hour <br /> <br />70.00/hour <br />