My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00241
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00241
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:45:08 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153496
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />CHAPTER VI: <br /> <br />" <br /> <br />Scope: <br /> <br />11 <br /> <br />ESTIMATED COSTS <br /> <br />Items (a).(b). and (c) will be considered in <br />the scope 0: this report. This portion 0: <br />the report will be developed based on the <br />scope 0: work determined in Chapter V. <br />Construction costs :or esch alternative <br />considered will be developed based on present <br />construction costs :or aimilar types 0: <br />construction. The cost estimates will be <br />detailed to try to accurately describe the <br />expected costs. Rough. highly inflated costs <br />will not be the obJective. Rather a good <br />estimate that is an average of the costs <br />actually expected. Contingencies will be <br />developed as such and will not be included in <br />the base estimste. <br /> <br />Cost: Engineering - 10 hours @ $45.00 $ 450.00 <br /> 10 hours ~ $30.00 300.00 <br /> Quantity Take-Offs- <br /> 28 hours @ $28.00 784.00 <br /> Report Preparation 111.00 <br /> Subtotsl S 1,645.00 <br /> <br />CHAPTER VII: <br /> <br />Scope: <br /> <br />PROJECT EVALUATION <br /> <br />As stated in the "Guideline", the purpose 0: <br />this chapter will be to provide a <br />comprehensive ProJect Evaluation showing the <br />proJect benefit and the ability of the NPIC <br />to psy :or the proJect. The bene:it-cost <br />ratios for the proJect will be developed for <br />this chapter with a discussion 0: the general <br />bene:its 0: the proJect shown versus the <br />consequences to the NPIC by not proceeding <br />with the proJect. As the proJect's purpose <br />is to secure NPIC water rights :or Clark Lake <br />snd to ensure the sa:ety 0: the reservoir <br />dam. this is what the proJect evaluation will <br />be directed toward. Although some bene:it <br />could be shown :or possible :uture M & I <br />water, bene:it to Fish and Wi1dli:e, <br />Recreation. and Drainsge, the primary purpose <br />of Clark Lake is to provide irrigation water <br />
The URL can be used to link to this page
Your browser does not support the video tag.