Laserfiche WebLink
<br />, . <br />" <br /> 10 <br /> Seepage Study <br />" Engineering-36 hrs. @ 630.00 6 1.080.00 <br /> 12 hrs. @ 645.00 540.00 <br /> Drafting - 10 hrs. @ 628.00 280.00 <br /> $ 1.900.00 <br /> Hydrology Study <br /> Enqineerinq-48 hrs. @ 645.00 S 2.160.00 <br /> - . <br /> 28 hrs. @ S30.00 840.00 <br /> $ 3,000.00 <br /> Outlet and Spillway Deaign <br /> Engineering-24 hrs. (jj $30.00 $ 720.00 <br /> Geotechnical Report <br /> (assemble all data :from drilling, <br /> testing.-and design together to provide <br /> a report o:f all phases o:f the <br /> '-geotechnical study) <br /> En9ineerin9-24 hrs. @ 645.00 S 1.080.00 <br /> 26 hrs. @ 634.00 884.00 <br /> Drafting - 18 hrs. @ 628.00 504.00 <br /> Typing - 16 hrs. @ 624.00 384.00 <br /> Report Preparation 148.00 <br /> $ 3,000.00 <br /> <br />Subtotal $16,445.00 <br />