Laserfiche WebLink
<br />CHAPTER V; <br /> <br />" <br /> <br />Scope: <br /> <br />Cost: <br /> <br />.~ <br /> <br />g <br /> <br />PLAN OF DEVELOPMENT <br /> <br />Items (a) through (g) will all be included in. <br />the scope of work. This section will provide <br />the most extensive and intensive portion of <br />the Feasibility Report. This section <br />provides the basis for which all the other <br />chapters will fit together to provide an <br />overall view of the feasibility of the <br />proJect. Lack of information in this phase <br />can distort the economic in~ormation <br />contained in the other chapters and can <br />distort the overall view of the "Feasibility" <br />of the proJect. This section will contain <br />all geotechnical. hydrologic, and structural <br />design and details for the proJect. Cross- <br />aection surveying and several borings have <br />been completed previously in other studies <br />conducted on this reservoir dam. The scope <br />of work proposed will be needed in addition <br />to the existing data to finish the design. <br /> <br />Subsurface Investigation (4 additional <br />borings) <br /> <br />S 1.200.00 <br /> <br />Installation of 3 piezometers <br /> <br />$ <br /> <br />675.00 <br /> <br />Laboratory Testing <br />(consisting of consolidated-undrained <br />triaxial tests, permeability tests. pinhole <br />tests, classification testa. swell- <br />consolidation tests, natural moistures and <br />densities) <br /> <br />.. 4,250.00 <br /> <br />Slope Stability Analysis <br /> Engineering-12 hrs. 19 $45.00 $ 540.00 <br /> 30 hrs. @ 1$30.00 gOO.OO <br /> Drafting - 6 hrs. @ 1$28.00 168.00 <br /> Report Preparation 92.00 <br /> S 1.700.00 <br />