My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00240
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153436
Contractor Name
Morrison Knudsen Engineers
Water District
0
County
Rio Blanco
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~ <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />'. <br /> <br />Potential impervious core or blanket material shall be remolded and tested <br />for permeability in addition to performing triaxial shear tests. <br /> <br />Results of the laboratory testing shall be contained in the final report and <br />shown on logs and maps where possible. <br /> <br />Task g - Dam Type Evaluation and Cost Estimates - After the dam sites have <br />been selected, and the foundation and materials investigation programs <br />completed, the Contractor shall conduct an evaluation of the types of dams <br />that would be suitable. Appraisal level cost estimates shall be prepared <br />for competitive types. <br /> <br />Cost estimates shall be prepared at each site for three to four sizes of <br />dams within the range of 50,000 to 300,000 acre-feet of storage, unless <br />there is found to be some upper size limitation due to geologic conditions. <br />Where more than one dam type is possible, costs for each type shall be <br />prepared. <br /> <br />The results of the foundation exploration shall be utilized to estimate the <br />required foundation treatment at each site, including estimated excavation <br />volumes, grouting, and drainage systems. The results of the construction <br />materials investigations relating to materials strengths, location, and <br />volume shall be used in preparing the cost estimates. Costs shall be to <br />mid-19S5 cost levels and shall include rights-of-way and land acquisition. <br /> <br />The cost estimates shall also reflect cost components <br />including outlets and spillways. Spillways shall <br />handle the probable maximum flood without endangering <br /> <br />for appurtenant works <br />be designed to safely <br />the dam. <br /> <br />Cost results shall be summarized in tabular and graphical form portraying <br />the cost per acre-foot of active storage for comparison purposes. <br /> <br />Task 10 - Reporting and Public Meetings -The Contractor shall keep the <br />designated State representative informed of the progress of the work by a <br />combination of oral and written reports during the course of the study. <br /> <br />A-13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.