My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00240
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00240
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:07 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153436
Contractor Name
Morrison Knudsen Engineers
Water District
0
County
Rio Blanco
Bill Number
HB 83-1102
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />=-. <br /> <br />! <br /> <br />. <br /> <br />. <br /> <br />. <br /> <br />,. <br /> <br />Oral reports shall be made approximately weekly during the time when field <br />and office work are actively in progress. Interim written reports of <br />progress and status shall be prepared for the following: <br /> <br />o Monthly status report, <br /> <br />o Documentation of the aerial photographs and topographic mapping <br />coverage, <br /> <br />o Recommendations for dam axis locations and conclusions regarding <br />reservoir area evaluations, and <br /> <br />o Outline of final report. <br /> <br />The Contractor shall make available to the State on a monthly basis a record <br />of labor and other direct cost expenditures associated with the study. <br /> <br />The Contractor shall assist the State in the conduct of public meetings. It <br />is anticipated that one public meeting would be held in Meeker, prior to the <br />start of field work on the project. The purpose of this meeting shall be to <br />advise the local public and interested landowners of the intent and scope of <br />the anticipated work. At the conclusion of the study, a second public <br />meeting shall be held in Meeker with the same interested parties, to present <br />the technical engineering data and conclusions derived from the study. <br /> <br />Task 11 - Report Preparation - The Contractor shall summarize the activities <br />and the results of the study in a final report. The report shall be well <br />organized to present elements of the work including topographic mapping, <br />geologic mapping, drill logs, geologic sections, test results, dam <br />evaluations, and cost estimates. A draft report shall be prepared and <br />submitted to the State for review and comment. Following the incorporation <br />of these comments, the report shall be finalized and thirty (30) copies <br />shall be produced and delivered to the State. <br /> <br />A-14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.