My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00239
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00239
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:13 AM
Creation date
10/5/2006 11:45:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0035X
Contractor Name
Juniper Project USBR 1963
Contract Type
Miscellaneous
Water District
0
County
Moffat
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
100
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />CHAPTER II <br /> <br />COMPREHENSIVE PLAN <br /> <br />Diversion Requirements at Heads of Main Canals <br /> <br />Seepage and operational losses from various reaches of the main canals <br />were estimated and added to the monthly irrigation delivery requirements at <br />turnouts from main canals as a means of determining the required monthly <br />irrigation diversion demands at the various sources of supplyo Separate <br />estimates were made for the Savannah Butte, Wonsits, Artesia, and Deadman <br />Bench Canals. Canal seepage losses were estimated with use of a coeffi- <br />cient for sandy loam soil as the canal~which are presently planned almost <br />entirely as unlined structures, would pass through outwash materials <br />throughout most of their lengths with seepage losses being relatively high. <br />Allowances were included in the estimates for losses during the initial <br />priming of the canals at the beginning of the irrigation seasono Canal <br />losses would be greatly reduced if the canals were lined, and the desir- <br />ability of lining will be considered in any future project studieso <br /> <br />. <br /> <br />The peak monthly irrigation water requirement would occur in Julyo <br />The peak canal capacity requirements were estimated by successive increases <br />in the average July requirement' at the head of the canals of about 6 per- <br />cent to allow for dry periods with no effective precipitation during the <br />month, about 10 percent for ab~ve-average consump~ve use during periods <br />of above-average temperatures, 'and 10 to 20 perc~nt for operational flexi- <br />bility and peaking within the month depending on the t4tal acreage served <br />by a particular canalo Thus the estimated peak capacity requirements are <br />about 30 percent higher than the average requirements for the month of July. <br /> <br />Estimates of average monthly irrigation requirements at the head of <br />the various canal areas and of peak canal capacity requirements are sum- <br />marized in the following paragraphs. <br /> <br />Savannah Butte Canal area.--The estimated irrigation diversion require- <br />ments at the head of the Savannah Butte Canal on White River for the 2,200 <br />acres that would be served by the canal are summarized in the following table. <br /> <br />Average monthly irrigation diversion requirements <br />at head of Savannah Butte Canal <br />(Unit--acre-feet) <br /> <br />Month <br />M~ <br />June <br />July <br />August <br />September <br />Totals <br /> <br />Per acre <br />0031 <br />093 <br />1007 <br />.93 <br />045 <br />3.69 <br /> <br />Requirement at turnouts <br />from canal <br />Total for <br />2,200 acres <br />700 <br />2,100 <br />2,400 <br />2,100 <br />1,000 <br />8,300 <br /> <br />Canal <br />seepage and <br />operational <br />losses <br />600 <br />500 <br />400 <br />400 <br />400 <br />2.300 <br /> <br />Average <br />diversion <br />requirement <br />at head of <br />canal <br />1,300 <br />2,600 <br />2,800 <br />2,500 <br />1,400 <br />10,600 <br /> <br />. <br /> <br />34 <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.