Laserfiche WebLink
<br /> <br />. <br /> <br />CHAPTER II <br /> <br />COMPREHENSIVE PLAN <br /> <br />Transmission system <br /> <br />Power generatea at the Juniper plant would be transmitted to load <br />centers via the Colorado River Storage project interconnected trans- <br />mission system now under construction. The Juniper powerplant would <br />interconnect with the nearby 138-kilovolt line of the storage project <br />system that will extena from Vernal to Hayden by way of Craig. Addi- <br />tions to lines and substations would be made as necessary to accommodate <br />the added power. <br /> <br />. <br /> <br /> <br /> <br />.. - , <br />Vernal to Hayden 138-kilovolt line of the Colorado River Storage <br />project located west of Juniper Mountain. <br /> <br />Recreational development <br /> <br />Basic public use recreational facilities would be provide a at Federal <br />cost for access, sanitation, and safety of the public and for protection of <br />the area. These would be provided at three favorable sites along the shore <br />of Juniper Reservoir and at one site at Artesia Reservoir. <br /> <br />Estimated costs <br /> <br />Construction costs of Juniper project features Were estimated at <br />January 1963 prices. Allowances were made in the estimates for contingen- <br />cies, engineering, overhead, rights-of-way, required relocations of existing <br /> <br />. <br /> <br />24 <br /> <br />