Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Costs <br /> <br />The estimated construction costs for the proposed wastewater system <br />are shown in the following table. <br /> <br />Wastewater System - Estimated Project Costs <br /> <br />Item Description Q,nty Unit Unit Total <br /> Price Price <br />1 8" PVC pipe 10,850 LF $ 8 $86,800 <br />2 4<3" std Manholes 30 Fa $800 $24,000 <br />3 Clean outs 9 Fa $300 $ 2,700 <br />4 Lift Station 3/4 Hp, duplex <br /> submerged pumps 2 Fa $7,000 $14,000 <br />5 Connections 4" @ 20' to <br /> Prop Line + Saddle 56 Fa $200 $11,200 <br />6 Bore & Jack <br /> Railroad 240 LF $ 60 $14,400 <br /> Road 120 LF $ 50 $ 6,000 <br /> Total Construction = $159,100 <br /> Contingency @ 15% = 23,865 <br /> $182,965 <br /> Price increase @ 10% = 18 ,297 <br /> $201,262 <br /> Engr, legal, admin @ <br /> 20% = 40,252 <br /> Total = $241,514 <br /> Lagoon costs 1/3 share = $ 34,000 <br /> Total Project Cost = $275,514 <br /> <br />33 <br />