Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Unit Costs <br />The table below shows the incremental costs of each main line (identified <br />on Map 3) for the construction of that line and its appurtenances, including <br />allowances for contingency, inflation, and professional services. The main <br /> <br /> <br />line from the lagoon to the junction of Lines A, B, and D is not considered <br /> <br /> <br />separately since its costs are attributable to all of the units to be served <br /> <br /> <br />by the system. <br /> <br />Line Number Total Cost <br /> of Cost per <br /> Connections Connection <br />A 14 $58,400 $4,200 <br />B 22 $79,200 $3,600 <br />C 7 $12,200 $1,700 <br />D 7 $44,800 $6,400 <br />L1..11e D could be extended south along Fox Farm Road approximately <br /> <br />7,000 feet to serve development in that area, The cost per connection for <br /> <br />the present number of homes would be approximately $11,000. <br /> <br />34 <br />