My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00237
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00237
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:46:32 AM
Creation date
10/5/2006 11:45:00 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153400
Contractor Name
Larkspur, Town of
Contract Type
Loan
Water District
8
County
Douglas
Bill Number
SB 79-537
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
43
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />I <br /> <br />The plant is new, unused, and has a capacity of 100,000 gpd (gallons per day). <br /> <br />The elevation difference between the plant and the sewer collection system <br /> <br />I <br /> <br />outfall at Larkspur is not sufficient for gravity flow. A lift station and <br /> <br />I <br /> <br />11,000 feet of force main would have to be constructed by Larkspur to convey <br /> <br />the wastewater to the_plant site. <br /> <br />I <br /> <br />To compare the costs of Alternatives 2 and 3, it is necessary to convert <br /> <br />the PPWS service charges to a present worth and then add the cost of an 11,000 <br /> <br />I <br /> <br />foot force main. Both alternatives will require a lift station, so its cost <br /> <br />I <br /> <br />is not included in the comparison. <br /> <br />The criteria and assumptions used to determine the present worth of the <br /> <br />I <br /> <br />District's wastewater service charges are: <br /> <br />I <br /> <br />1. Current wastewater service charges for outside users will <br />remain consistent for twenty years at $21 per month per tap. <br /> <br />I <br /> <br />2. Annual Larkspur wastewater bill will be: <br />$21.00 x 12 x 51 connections = $12,852.00 <br /> <br />I <br /> <br />3. Interest rate and term similar to a bond issue at <br />77. and 20 years. <br /> <br />The present worth of buying wastewater treatment services from the PPWS <br /> <br />I <br /> <br />District for twenty years at the current rates and for the present number of <br /> <br />connections is $136,000. To this must be added approximately $84,000 for the <br /> <br />I <br /> <br />construction (including contingencies, inflation, and services) of the required <br /> <br />I <br /> <br />force main. The minimum equivalent cost for this treatment alternative is <br /> <br />$220,000. The actual equivalent cost is probably higher since the service <br /> <br />I <br /> <br />charges will probably increase during the next twenty years, the number of <br /> <br />Larkspur connections is projected to increase by fifty percent, and Larkspur's <br /> <br />I <br /> <br />project financing will be through grants and lower interest rate loans. <br /> <br />I <br /> <br />I <br /> <br />29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.