My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00231
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153402
Contractor Name
Fort Lyon Canal Company
Water District
0
County
Bent
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />, <br /> <br />. <br /> <br />~ <br /> <br />The Fort Lyon Canal Company <br />December 21, 1982 <br />Page 2 <br /> <br />c. Adobe Creek and Horse Creek Re,servoirs -- Development of <br />area-capacity relationships for these reservoirs from survey <br />data obtained by separate contract to allow FLCC to utilize <br />its storage water more efficiently, and investigation of <br />dredging between ponds to incre'lse the volume of water that <br />can be released for beneficial use. <br /> <br />2. Determining the feasibility of rehabilitation and improvements to <br />features on the Fort Lyon Canal consisting of: <br /> <br />a. Fort Lyon Canal flume across Horse Creek -- Rehabilitation of <br />the 10-foot diameter steel pipe flume across Horse Creek; <br /> <br />b. Lateral headgates and measuring flumes -:- Repairs or replace- <br />ment of lateral headgates and me,asuring flumes for each lateral; <br /> <br />c. Miscellaneous control structures -- Repairs or replacements to <br />numerous waste ways, wasteway ~Iates, sluice gates, check <br />structures and other control structures; <br /> <br />d. Water measurement structures -- Addition of water measurement <br />structures and/or rated control se,ctions for measuring and record- <br />ing flows into the five divisions .)f the Fort Lyon Canal; <br /> <br />e. Canal lining and canal embankment stabilization -- Lining of <br />selected segments of the Fort Lyon Canal to reduce seepage <br />losses for improved water management; <br /> <br />f. Thurston Reservoir -- Constructic," of a pumping station and about <br />1,300 feet of pipeline to connect this water source to the Fort <br />Lyon Canal; <br /> <br />g. Control basin -- Dredging of sediment or the raising of the embank- <br />ment around the basin to increas,~ its capacity; <br /> <br />h. Lateral lining or buried pipe latE,rals -- Lining selected sections <br />of laterals or replacing open laterals with buried pipe to improve <br />the system's overall operating efficiency. <br />
The URL can be used to link to this page
Your browser does not support the video tag.