My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00231
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153402
Contractor Name
Fort Lyon Canal Company
Water District
0
County
Bent
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. <br /> <br />. <br /> <br />'. <br /> <br />APPENDIX A <br />TIPTON AND KALMBACH, INC, <br /> <br />ON I!: PA"''' Ci!!:NTI'tAI.,SUITE 1401 <br />1515 ARAPAHOE STREET <br /> <br />CL.INTON W. MEt-l~'NG. PRESIDENT <br />E. R. M1GHELL., EXEC. VICE PRESIOENT <br />H. F'. BISHOP, VICE PRESIDENT <br />A. oJ. DEUTSCH. TREASURER <br />,J. H. TURNER. SECRETARY <br /> <br />DENVER, COLORADO 60202 <br /> <br />PHON!!: {303l 572-8081 <br /> <br />CABLE: <br />ARTIP - DENVER <br /> <br />December 21, 1982 <br /> <br />TWX: <br />910-931-2540 <br /> <br />The Fort Lyon Canal Company <br />P.O. Box 231 <br />Las Animas, CO 81054 <br /> <br /> <br />Attention: Mr. Dean Smartt, President <br /> <br />Subject: Proposal for Performing the Feasibility Study for <br />Rehabilitation and Improvements to the Fort Lyon <br />Canal Company System <br /> <br />Gentlemen: <br /> <br />We are pleased to submit this proposal for performing the feasibility study <br />for rehabilitation and improvements to the Fort Lyon Canal Company system in <br />accordance with our discussions. The feasibility study will be made following the <br />Colorado Water Conservation Board Guidelines to qualify the rehabilitation and <br />improvements for funding in part by a loan from the Colorado Water Conservation <br />Board Construction Fund. ' <br /> <br />In general, the services we propose consist of determining the feasibility <br />of rehabil itation and improvements of features on the Fort Lyon Storage Canal <br />and Reservoirs, and the Fort Lyon Canal. <br /> <br />Specifically, our services include the following tasks: <br /> <br />1. Determining the feasibility of rehabilitation and improvements to <br />features on the Fort Lyon Storage Canal and Reservoirs consisting of: <br /> <br />a. Fort Lyon Storage Canal Sluiceway -- Construction of a sluice- <br />way or sedimentation pond to provide more economical handling <br />of sediment than the present expensive dredging; <br /> <br />b. Fort Lyon Storage Canal siphon across Horse Creek -- Replace- <br />ment of two concrete pipes having a combined capacity of <br />about 2,000 cfs with new siphon; <br /> <br />APPENDIX A <br />
The URL can be used to link to this page
Your browser does not support the video tag.