My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00231
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00231
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:52 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153402
Contractor Name
Fort Lyon Canal Company
Water District
0
County
Bent
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />,. <br />I <br /> <br />re' <br /> <br />The Fort Lyon Conal Company <br />December 21, 1982 <br />Page 3 <br /> <br />3. Preparing a feasibility report in 25 copies to be distributed os requested <br />by the Fort Lyon Conal Company to the Colorado Water Conservation <br />Boord, the Fort Lyon Conal Company and other agencies. The format <br />and coveroge for the report will be as detailed in "Guidelines for <br />Assistance in the Conservation and Utilization of Colorado's Water <br />Resources through the Colorado Water Conservation Boord Construction <br />Fund" Deportment of Natural Resources, Colorado Water Conservation <br />Board, 1978, modified as applicable for this project. <br /> <br />We suggest as .the basis of compensation for the above described services the <br />following criteria: <br /> <br />1. 2.5 times the allocated payroll cost of staff personnel based on the <br />net time directly expended on the work, plus <br /> <br />2. Reimbursement of direct non-salary expenses for travel, subsistence, <br />, communication, reproduction costs, costs of services of outside <br />consultants, and report printing costs. <br /> <br />Based on these criteria, we estimate the services will cost $54 ,000 for per.., <br />forming the feasibility study. Detail of this estimate is given in the following . <br />table: <br /> <br />Estimate of Cost of Feasibility Study <br />for Rehabilitation and Improvements <br />to the Fort Lyon Canal Company System <br /> <br />1. Salary Costs <br /> <br />Position <br /> <br />Individual <br /> <br />Principal-Civil Engineer <br />Principal-Civil Engineer <br />Civil Engineer-Water Rights <br />Hydrologist <br />Civil Engineer <br />Civil Engineer <br />Draftsman <br /> <br />C.W. Mehring <br />E.R.Mighell <br />D.O. Helton <br />T.A. Williamsen <br />J .R. Waugh <br />B.S. Johnson <br />R.S. Hiratsuka <br /> <br />Work' <br />Hours <br /> <br />Billing <br />Rate <br />(2.5 A PC) Amount <br /> <br />$86.55 $ 3,116 <br />77 .88 11,838 <br />72.13 7,790 <br />46.73 1,215 <br />40.00 9,200 <br />34.63 7,757 <br />33.93 3,529 <br /> <br />36 <br />152 <br />108 <br />26 <br />230 <br />224 <br />104 <br />
The URL can be used to link to this page
Your browser does not support the video tag.