My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00229
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00229
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:12 AM
Creation date
10/5/2006 11:44:50 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153512
Contractor Name
Summit County
Water District
0
County
Summit
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
45
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />.' <br /> <br />" <br /> <br />. <br /> <br />. <br /> <br />For Ot>iective E: <br /> <br />Analyze alternative water supply diversions for Dillon and <br />Dillon Valley. <br /> <br />1. <br /> <br />Indicate any water supply and water quality problems <br />associated with the existing Straight Creek diversions. <br /> <br />2. <br /> <br />Determine whether a small reservoir or diversion <br />structure on Lasky Gulch could be a feasible <br />alternative. If so, determine storable inflow. <br />capacity. preliminary cost. and how the reservoir could <br />be used in conjunction with Denver's proposed Straight <br />Creek diversion project. <br /> <br />3. <br /> <br />Determine what options are available to provide Dillon <br />and Dillon Valley with a reliable water supply from <br />both quality and quantity pe~spectives. Discuss the <br />feasibility and estimate the cost of these alternatives. <br /> <br />L <br /> <br />Discuss possible utilization of Old Dillon Reservoir <br />and its associated direct flow decrees as an <br />alternative. <br /> <br />s. Summarize the results and ma;:e recommenClations <br />concerning alternative water supplies for Dillon and <br />Dillon Valley. incluCling Cliscussion of legal issues and <br />costs based upon alternative financing mechanisms. <br /> <br />For Obiective D: <br /> <br />1. Analyze and review how the operations of Dillon <br />Reservoir. Green Mountain Reservoir, the Goose Pasture <br />Tarn. and future projects could be integrated in a <br />manner that proviCles for both diversion uses and <br />instream flows. Outline a mitigation plan that will <br />meet requirements of the Bureau of Reclamation for <br />water users within Summit County to obtain Green <br />Mountain Reservoir water service contracts. This will <br />require consultation with the Bureau of Reclamation and <br />other feCleral and state agencies. <br /> <br />2. Summarize the results and disl=uss findings. The <br />discussion should include the leoal and other <br />institutional issues that have t~ be addressed to <br />implement an integrated opera~ions plan. including <br />appropriate roles for the Denver Water Department. <br />Colorado River Water Conservation District. summit <br />County, State Engineer, and cweB in such a plan. <br /> <br />5tuiiv ReDort <br /> <br />A final report will be ~repared to describe the stuiiy <br />process and the results of the study, <br /> <br />-4 - <br />
The URL can be used to link to this page
Your browser does not support the video tag.