My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153835A Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153835A Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:44:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153835A
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />....,...,'........,...,...........,...-.....,..'............ <br />....,.........,............................................. <br />Itan.'iNIi! <br />....----------..--..,--.,.... <br />........................... <br /> <br />38 <br /> <br />39 <br /> <br />40 <br /> <br />41 <br /> <br />42 <br /> <br />>~ <br />, <br /> <br />Table ID-I (cont.) <br />Existing Facilities Inventory <br /> <br /> <br />Westerdoll Dam <br /> <br />The existing dam is classified as a Class III dam but the SEO has indicated <br />they are reviewing reclassifYing the dam to a Class II dam, The existing <br />spillway does not meet the SEO for a Class II or Class III dam. The outlet <br />works has been partially crushed which has reduced its flow capacity. <br /> <br />The existing spillway will flood residences along the perimeter of the <br />reservoir during a 100-year flood event, <br /> <br />Heinricy Dam is not a jurisdictional facility, The existing spillway is in good <br />condition and has adequate capacity. <br /> <br />Boyd Lake does not have a spillway, The dam is classified as a Class I dam <br />which requires a 75% PMP spillway. <br /> <br />Equalizer Dam does not have a spillway. The existing dam is classified as a <br />Class III facility which requires a 100-year spillway. Future land <br />development at the toe of the dam will cause a reclassification of the dam to <br />a Class I facility which will require a 75% PMP spillway. <br /> <br />Upper and Lower Hoffinan Dam <br /> <br />Heinricy Dam <br /> <br />Boyd Lake Dam <br /> <br />Equalizer and Houts Dam <br /> <br />Oklahoma Check <br /> <br />Not <br />Shown <br /> <br />E:\G&LREPOR. WPD <br /> <br />Oklahoma Check - <br />Located on the Greeley and Loveland <br />Canal approximately I mile <br />east ofI-25 <br /> <br />Condition: Poor; Capacity - 446 cfs <br /> <br />12 <br /> <br />January 26,1998 <br /> <br />------- <br /> <br />- - -- <br /> <br />----- <br /> <br />- --: <br />"-~ <br />
The URL can be used to link to this page
Your browser does not support the video tag.