My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153835A Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153835A Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:53 AM
Creation date
10/5/2006 11:44:37 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153835A
Contractor Name
Greeley and Loveland Irrigation Company
Contract Type
Loan
Water District
3
County
Weld
Bill Number
HB 98-1189
Loan Projects - Doc Type
Feasibility Study
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
280
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />- - .. - - '- - - - - - - - - - - - - - <br /> <br />............,.........-........ <br />............................................................... <br />JtirilijjI <br /> <br />42 <br /> <br />Table ID-l (cont.) <br />Existing Facilities Inventory <br /> <br /> <br />Equalizer Lake Gated Outlet Structure <br />Five Gates; 4-foot 6-inch bays <br /> <br />Lake Loveland North Outlet (Dry Creek) <br /> <br />32 <br /> <br />33 <br /> <br />34 <br /> <br />35 <br /> <br />Condition: Poor; Capacity - 446 cfs <br /> <br />West 29th Street Bridge <br />Bottom Width 23-foot; Side Slopes 2: 1 <br /> <br />Control Structure at Railroad Crossing <br />Sta, 74+3 I <br /> <br />U.S. Highway 287 Bridge Sta. 43+51 <br />Bottom Width 40-foot; Side Slopes I: 1 <br /> <br />County Road No. I3E Sta. 1+50 <br />Bottom Width 2 I -foot; Side Slopes 1: I <br /> <br />Condition: Excellent; Capacity - 1,000 cfs <br /> <br />Condition: Poor; Capacity - 375 cfs <br /> <br />Condition: Excellent; Capacity - 1,000 cfs <br /> <br />Condition: Excellent; Capacity - 1,000 cfs <br /> <br />36 <br /> <br />Reservoirs and Related Structures <br /> <br />Lake Loveland Dam <br /> <br />Spillway not required based on incremental damage analysis accepted by the <br />SEO (1994). <br /> <br />37 <br /> <br />E:\G&LREPOR. WPD <br /> <br />Horseshoe Dam <br /> <br />The existing spillway has capacity slightly over 100-year flood, but <br />Horseshoe is a Class II dam and requires a larger 50% PMP spillway. The <br />existing spillway is in good condition. <br /> <br />11 <br /> <br />January 26, 1998 <br />
The URL can be used to link to this page
Your browser does not support the video tag.