My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153321 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153321 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:41:10 AM
Creation date
10/5/2006 11:44:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153321
Contractor Name
Ridgway, Town of
Contract Type
Loan
Water District
60
County
Ouray
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />1 <br />I <br />I <br />I <br />1 <br />1 <br />I <br />I <br />1 <br />1 <br />I <br />1 <br />1 <br /> <br />for surveying and inspection due to necessary <br /> <br />legal descriptions on the easements and survey- <br /> <br />ing the route to a grade to provide continual <br /> <br />gravity. <br /> <br />Construction of this Alternate will be very difficult. <br /> <br />Noting Exhibit Xlb, the geological map indicates that some <br /> <br />rock might be encountered. Visual trips along the route show <br /> <br />some outcropping, but the exact depth, amount, hardness, etc., <br /> <br />will not be known until some test holes ~re dug. Secondly care <br /> <br />will have to be taken to make the grade exact, as the pipeline <br /> <br /> <br />is gravity having :1:3'-00" bury depth. One precaution will be <br /> <br /> <br />the use of pressurized pipe. The pressurized pipe will allow <br /> <br /> <br />pressure to build up rather than burst the pipe should a block- <br /> <br />age occur. Secondly, it gives added protection from damage by <br /> <br />equipment due to the shallow bury depth. No wet conditions are <br /> <br />expected save for a short section in Cottonwood Canyon. Some <br /> <br />steep gradients are expected and will require extra equipment <br /> <br />as with the rock. <br /> <br />5. Alternate IVa (revised); (Exhibit Xlllf) <br />Alternate IVa (revised) is basically the same as <br /> <br />Alternate IV. It likewise encompasses Alternate III. Features <br /> <br />as described in Alternate IV are repetitious in nature to this <br /> <br />Alternate. The basic advantage of Alternate IVa (revised) over <br /> <br /> <br />Alternate IV is a more direct routing of the pipeline. The pipe <br /> <br /> <br />diameter has been increased from 6" to 8" and Class 100 Irrigation <br /> <br />27 <br />
The URL can be used to link to this page
Your browser does not support the video tag.