My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153321 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153321 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/27/2014 11:41:10 AM
Creation date
10/5/2006 11:44:04 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153321
Contractor Name
Ridgway, Town of
Contract Type
Loan
Water District
60
County
Ouray
Bill Number
SB 78-69
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />1 <br /> <br />1 <br /> <br />1 <br /> <br />pipe will be used. <br /> <br />I <br /> <br />In addition to those comments noted under Alternate <br /> <br />1 <br /> <br />IV, Alternate IVa (revised) presents the following additional <br /> <br />advantage: <br /> <br />I <br /> <br />1) Cost - Alternate IVa (revised) is approximately <br />$12,000.00 cheaper than Alternate IV. A"smaller <br /> <br />1 <br /> <br />tank can be used in view of the raw water storage <br /> <br />and pumping unit in the treatment plant which will <br />~ <br />supply additional fire demand protection. This <br /> <br />I <br /> <br />1 <br /> <br />would save approximately $39,000.00. <br /> <br />2) Although monies have been allocated for land and <br /> <br />easements, all of it may not be needed. If the <br /> <br />pipeline can parallel as nearly as possible to the <br /> <br />existing Ridgway Ditch, the right of adverse posses- <br /> <br />sion may be employed due to the continual use of the <br /> <br />ditch. Such would not be the case under Alternate <br /> <br />1 <br /> <br />1 <br /> <br />I <br />1 <br /> <br />IV where new routing of the pipeline would require <br /> <br />additional land and easements. <br /> <br />I <br /> <br />Disadvantages to Alternate IVa (revised) in addition to <br /> <br />1 <br /> <br />~hose mentioned under Alternate IV, are: <br /> <br />1) Alternate IV would utilize a more gradual grade with <br /> <br />a paralleling access road. Alternate IVa (revised), <br /> <br />in following the Ridgway Ditch, will have steeper <br /> <br />slopes. These areas at present are problem spots <br /> <br />1 <br /> <br />1 <br /> <br />1 <br /> <br />28 <br /> <br />1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.