Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />'e <br /> <br />.-z.." <br />fen1114 <br />jail... 1.,' Castle Pines North <br /> <br /> Phase I - Cost Estimates for Arapahoe Well PlIIIIflIMotor Replacement <br /> A, Estimated Pump/motor Costs for Arapahoe Well A-2 <br /> Est <br />Item No, Description Qty Unlls Unn Price Price <br /> 1 Pump 1 loS. $15,000,00 $15,000 <br /> 2 Motor and seals 1 L.S. $25,000,00 $25,000 <br /> 3 6,5 in Co/um Pipe 1600 L.F. $10,50 $16,800 <br /> 4 Pump/motor/pipe Install 1600 L.F, $3,25 $5,200 <br /> 5 Power Cable and step up 1 L.S. $20,000,00 $20,000 <br /> transformer <br /> 6 Pftless Adapter (1) o N.A. $0,00 $0 <br /> 7 6,5 in check valve 2 each $1,500,00 $3,000 <br /> 8 Airline - 2 each 3200 L.F. $0.20 $640 <br /> 9 Distrib pipe to VBUn 50 L.F. $10.50 $525 <br /> 10 m-scope tube 3200 loF, $0,40 $1,280 <br /> 11 Vaun (2) 1 L.S. $10,000.00 $10,000 <br />. 12 Soft start w/ control panel 1 L.S. $20,000,00 $20,000 <br />13 Shroud 1 loS. $2,700,00 $2,700,00 <br />14 Conduit/cable fm service 1 L.S. $3,500,00 $3,500,00 <br /> to controls to step up trans. <br /> subtolal $123,645 <br />Noles: (1) Assume exIstlng piUess unit reused. <br /> (2) New Vaun needed at A-2 and A~ slle only. Total $123,645 <br /> <br />B, Pump/motor Installation DesIgn Consultln{l Cost Estimates <br />Consulting services: Plans, specs, contraot admin, <br />construction observatlon, testing and reports: <br /> <br />Phase I YoUI Project costs = <br /> <br />$3,000 <br />$126,646 <br /> <br />Note: The above analysis assumes medium vcJ/tage pump and standan:t controls. <br />The above estimates are based on an average setting for each Arapahoe well and <br />will vary depend'1Ilg upon actual site concfdions and depth setting analyses. <br />The above estimates assume existing tranSformers at each site wID not have to be replaced. <br /> <br />. <br />