Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />.4t <br /> <br />'. <br /> <br />_wbl <br />llnl/M <br />jail.., 121,1 Castle Pines North <br /> <br />Phase 1- REVISED Cost Estimates for Arapahoe Well A-3 PumplMotor Replacement <br /> <br /> Est <br />Item No, Description Qty Units Unit Price Price <br /> 1 Pump 1 L.S, $15,000,00 $15,000 <br /> 2 Motor and seals 1 L.S, $25,000,00 $25,000 <br /> 3 6.5 in CoIum Pipe 1750 L.F, $10,50 $18,375 <br /> 4 Pump/motor/pipe install 1750 L.F, $3,25 $5,688 <br /> 5 Power Cable and step up 1 L.S. $20,000.00 $20,000 <br /> transformer <br /> 6 Pltless Adapter (1) ONA $0,00 $0 <br /> 7 6.5 In check vaJve 2 each $1,500,00 $3,000 <br /> 8 Airline - 2 each 3500 L.F. $0,20 $700 <br /> 9 Distrib pipe to vault 50 L,F, $10,50 $525 <br /> 10 m-scope tube 3500 L.F. $0,40 $1,400 <br /> 11 Vault (2) 1 L,S. $10,000,00 $10,000 <br />. 12 Soft start w/ control panel 1 L.S. $20,000.00 $20,000 <br />13 Shroud 1 L.S. $2,700.00 $2,700.00 <br />14 Conduit/cable fm service 1 L.S. $3,500,00 $3,500.00 <br /> to controls to step up trans. <br /> subtolal $125,888 A-3 <br />Notes: (1) Assume existing pltIess unlt reused. <br /> (2) New Vault needed at A-3 site. <br /> <br />B, Pump/molor InstaIlatlon DesIgn Consulting Cost Est/mates <br />Consulting servlces: Plans, specs, contract admin, <br />construction observation, testing and reports: <br /> <br />Est. Total ProjKt costs II <br /> <br />$3,000 <br />$128,888 <br /> <br />Note: The above analysis assumes medium wItage pump and standard controls. <br />The abova estimates are based on an ESTIMATED selling depth for Well A-3 <br />determined from water level measurement taken on Sept. 16, 1994 by AmWest <br />during video survey and IinaI depth setting may V8IY following fwther analysis. <br />The abova estimates assume existing transformer will not have to be replaced. <br /> <br />. <br />