Laserfiche WebLink
<br />. <br /> <br />. <br /> <br />. .l';''',tj!t:.,; <br /> <br />'. <br /> <br />. <br /> <br />_Wb1 <br />fCl/3fll4 <br />jail 110, f2IU Castle Pines North <br /> <br /> Phase I - Cost Estimates for Arapahoe Well Pump{Motor Replacement <br /> A, Estimated Pump/motor Costs for Arapeh08 Well A-1 <br /> Est <br />Item No, Descrlptlon Qty Units Unit Price Price <br /> 1 Pump 1 L.S, $15,000,00 $15,000 <br /> 2 Motor and seals 1 L.S. $25,000,00 $25,000 <br /> 3 6.5 in CoIum Pipe 1550 L.F', $10,50 $16,275 <br /> 4 Pump/motor/pipe install 1550 L.f". $3,25 $5,038 <br /> 5 PO\/I/9f Cable and step up 1 L.S. $20,000.00 $20,000 <br /> transformer <br /> 6 P~1ess Adapter (1) ONA $0,00 $0 <br /> 7 6,5 in check valve 2 eaoh $1,500,00 $3,000 <br /> 8 Airline, 2 each 3100 L,F, $0,20 $620 <br /> 9 Distrib pipe 10 vault 50 L.F'. $10,50 $525 <br /> 10 m-scope lube 3100 L.f". $0,40 $1,240 <br /> 11 Vaull (2) 1 L.S. $10,000,00 $10,000 <br />. 12 Soft start wi conlroI panel 1 L,S. $20,000,00 $20,000 <br />13 Shroud 1 L.S. $2,700.00 $2,700,00 <br />14 Conduillcable fm servtce 1 L.S. $3,500.00 $3,500.00 <br /> '0 controls '0 step up trans, <br /> subtotal $122,898 <br />Noles: (1) Assume existing p/lJess unll reused. <br /> (2) New Vault needed at A-2 and A-3 site only. Total $122,898 <br /> <br />B. Pump/motor InstaIlaIion Design Consulting Cost Estimates <br />Consulting services: Plans, specs, contraCl admin, <br />conslruclion observation, testing and reports: <br /> <br />Phase I Total Project costs " <br /> <br />$3,000 <br />$125,898 <br /> <br />Nole: The above analysis assumes medium voltage pump and standard controls. <br />The above estimates are based on an average setting for each Arapahoe weD and <br />will vary depending upon actual site concfdions and depth setting analyses, <br />The above estimates assume existing l/lIllSformers at each site will not have to be repIaoed. <br /> <br />. <br />