Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />,I <br />I <br />I <br />I <br />I <br />I <br />I I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />-29- <br /> <br />5. A suitable footbridge across the existing spillway will need to be <br />provided. This is necessary to allow foot traffic to access trail <br />#1123 and also for operation and maintenance of the outlet works and <br />fisherman dispersal. <br /> <br />6. All disturbed areas excluding soil-cement would require reclamation. <br /> <br />7. A performance bond will be required from the Town of Oak Creek to <br />ensure all reclamation work is completed. Based on a preliminary <br />evaluation of the feasibility level cost estimates provided to the <br />Forest Service, Mr. Jaminet estimates the performance bond amount to <br />be on the order of $20,000. The performance bond can be posted in <br />cash or in the form of an irrevocable letter of credit from the <br />Town's bank or other suitable agent. <br /> <br />8. It is possible that the existing permit authorizing operation and <br />maintenance of Sheriff Reservoir will need to be amended. <br />