Laserfiche WebLink
<br />I <br /> <br />I <br />I <br /> <br />Alternate Number Two <br /> <br />COST ESTIMATE <br />FOR <br />RAW WATER RESERVOIR, TREATMENT PLANT, AND FACILITIES <br />TO TAKE WATER FROM DOLORES RIVER AT DOVE CREEK, COLORADO <br /> <br />I <br />I <br /> <br />300 gallon per minute treatment plant = <br /> <br />Building for treatment plant: <br />2,500 sq. ft. @ $30.00 per sq. ft. = <br /> <br />I <br /> <br />100 acre-foot raw water reservoir, <br />lined and fenced. <br /> <br />I <br /> <br />300,000-gallon treated water storage <br />reservoir. <br /> <br />I <br />I <br />I <br /> <br />Raw water intake, pumps, and piping <br />at Dolores River. <br /> <br />Land for raw water reservoir and <br />treatment plant. <br /> <br />Required distribution improvements <br /> <br />I <br /> <br />Contingencies, rights of way, legal, <br />Engineering, and Inspection fees @ 25% <br /> <br />Total Project Cost for Dove Creek <br /> <br />I <br /> <br />Additional cost to provide service <br />for rural users and provide <br />an interconnection with <br />Montezuma Water Company <br /> <br />II <br /> <br />Total Project Cost <br /> <br />I <br /> <br />I <br />I <br />I <br /> <br />I <br />II <br /> <br />V - 2 <br /> <br />= <br /> <br />$ 100,000.00 <br /> 75,000.00 <br /> 150,000.00 <br /> 70,000.00 <br /> 40,000.00 <br /> 40,000.00 <br /> 175,000.00 <br />$ 650,000.00 <br />$ 162,500.00 <br />$ 812,500.00 <br /> <br />= <br /> <br />= <br /> <br />= <br /> <br />= <br /> <br />$ 396,875.00 <br /> <br />$1,209,375.00 <br />