My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153167 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
10/5/2006 11:43:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />Alternate Number One <br /> <br />I <br /> <br />COST ESTIMATE <br />FOR <br />PIPELINE AND FACILITIES FROM PLEASANT VIEW TO DOVE CREEK, COLORADO <br /> <br />I <br /> <br />8-inch pipeline in place: <br />80,000 feet @ $5.00 per ft. <br /> <br />= <br /> <br />$ 400,000.00 <br /> <br />I <br /> <br />Intermittent rock excavation: <br />10,000 feet @ $4.00 per ft. <br /> <br />= <br /> <br />40,000.00 <br /> <br />I <br /> <br />Valves and fittings. <br /> <br />= <br /> <br />8,000.00 <br /> <br />I <br /> <br />150 gallon per minute pump station <br />located between Cahone and <br />Dove Creek. <br /> <br />= <br /> <br />20,000.00 <br /> <br />I <br /> <br />Two 200,000-gallon reservoirs. <br />One at pleasant View and <br />one at Dove Creek. <br />2 @ $60,000.00 each <br /> <br />= <br /> <br />120,000.00 <br /> <br />I <br /> <br />Required distribution improvements <br /> <br />= <br /> <br />175,000.00 <br />$ 763,000.00 <br /> <br />I <br /> <br />Contingencies, rights of way, legal, <br />Engineering, and Inspection fees @ 25% <br /> <br />$ 190,750.00 <br /> <br />I <br /> <br />Total Project Cost for Dove Creek <br /> <br />$ 953,750.00 <br /> <br />I <br /> <br />Additional costs for rural customers <br />between Cahone and Dove Creek: <br />Meters, distribution, highway <br />crossing, etc. <br />55 tap s <br /> <br />= <br /> <br />$ 90,000.00 <br /> <br />I <br /> <br />I <br /> <br />Contingencies, rights of way, legal, <br />Engineering, and Inspection fees @ 25% <br /> <br />22,500.00 <br /> <br />I <br />I <br /> <br />Additional Costs to Provide Service <br />to Additional Users <br /> <br />$ 112,500.00 <br /> <br />Combined Project Cost <br /> <br />$1,066,250.00 <br /> <br />The unknown cost is for treated water at Pleasant View. <br /> <br />I <br /> <br />I I <br /> <br />,I <br /> <br />V - 1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.