My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153167 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
10/5/2006 11:43:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />, <br />, <br />II <br />I <br />II <br />I <br />I <br />I <br />I <br />I <br />,I <br /> <br />COST ESTIMATE <br />FOR <br />COSTS TO SUPPLY WATER TO RURAL AREA BETWEEN DOVE CREEK AND CAHONE <br />AND PROVIDE AN INTERCONNECTION WITH MONTEZUMA WATER COMPANY <br />WITH DOVE CREEK AS SOURCE USING ALTERNATE NUMBER TWO <br /> <br />Pipeline - 6-inch PVC <br />64,000 feet @ $4.00 per ft. <br /> <br />= <br /> <br />$ 256,000.00 <br /> <br />Meter Assemblies <br />55 @ $300.00 each <br /> <br />= <br /> <br />16,500.00 <br /> <br />Highway Crossing <br /> <br />= <br /> <br />20,000.00 <br /> <br />Miscellaneous valves, fittings, etc. <br /> <br />= <br /> <br />5,000.00 <br /> <br />Intermittent rock excavation <br /> <br />= <br /> <br />20,000.00 <br />$ 317,500.00 <br /> <br />Contingencies, rights of way, legal, <br />engineering, and inspection fees @ 25% <br /> <br />$ 79,375.00 <br /> <br />Total Project Cost <br /> <br />$ 396,875.00 <br /> <br />V - 3 <br />
The URL can be used to link to this page
Your browser does not support the video tag.