Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'. <br />. <br />I <br />I <br />I I <br />I <br />I <br />I <br /> <br />An alternate means of transporting the water out of Monument <br /> <br />Creek by constructing the ditch would be to construct the raw water <br /> <br />pump <br />below <br />Creek <br /> <br />then <br /> <br />station and 2.4 miles of pipeline from a point on the creek <br /> <br />the proposed Monument Creek Reservoir to the proposed Dove <br /> <br />raw water reservoir. This pump station and pipeline would <br /> <br />be part of the proposed future development of the Dolores <br /> <br />Pro ject. <br /> <br />These are all potential sources of raw water for the Town, <br /> <br />which should be fully investigated if it is decided to proceed with <br /> <br />Alternate Number Two and funds for construction are made available. <br /> <br />The unknown <br /> <br />water rights if <br />to ensure that <br /> <br />for Alternate Number Two is the cost of adequate <br /> <br />it is decided that additional rights are necessary <br /> <br />water would be available at the Dove Creek river <br /> <br />station until the Dolores Project is constructed, at which time <br /> <br />the adequate water will be available for municipal and industrial <br /> <br />purposes at Monument Creek Reservoir. <br /> <br />IV - 4 <br />