My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
C153167 Feasibility Study
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
C153167 Feasibility Study
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/17/2015 12:03:42 PM
Creation date
10/5/2006 11:43:02 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153167
Contractor Name
Dove Creek, Town of
Contract Type
Loan
Water District
32
County
Dolores
Bill Number
SB 77-35
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
61
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />'. <br />. <br />I <br />I <br />I I <br />I <br />I <br />I <br /> <br />An alternate means of transporting the water out of Monument <br /> <br />Creek by constructing the ditch would be to construct the raw water <br /> <br />pump <br />below <br />Creek <br /> <br />then <br /> <br />station and 2.4 miles of pipeline from a point on the creek <br /> <br />the proposed Monument Creek Reservoir to the proposed Dove <br /> <br />raw water reservoir. This pump station and pipeline would <br /> <br />be part of the proposed future development of the Dolores <br /> <br />Pro ject. <br /> <br />These are all potential sources of raw water for the Town, <br /> <br />which should be fully investigated if it is decided to proceed with <br /> <br />Alternate Number Two and funds for construction are made available. <br /> <br />The unknown <br /> <br />water rights if <br />to ensure that <br /> <br />for Alternate Number Two is the cost of adequate <br /> <br />it is decided that additional rights are necessary <br /> <br />water would be available at the Dove Creek river <br /> <br />station until the Dolores Project is constructed, at which time <br /> <br />the adequate water will be available for municipal and industrial <br /> <br />purposes at Monument Creek Reservoir. <br /> <br />IV - 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.