Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Possible Advantages <br /> <br />Alternate Number One <br /> <br />service for approximately 55 additional families <br /> <br />1. Provide <br /> <br />2. <br /> <br />3. <br /> <br />4. <br /> <br />between Cahone and Pleasant View. <br /> <br />Provides for an alternate source in the future in case of <br /> <br />an emergency. <br /> <br />Provides flow in reverse direction when Dolores Project <br /> <br />is constructed. <br /> <br />Provides wider potential distribution of treated water <br /> <br />from the Monument Creek Reservoir of the Dolores Project. <br /> <br />Alternate Number Two <br /> <br />1. <br /> <br />Town retains control of water sources and facilities. <br /> <br />2. <br /> <br />Less miles of pipeline to maintain. <br /> <br />3. <br /> <br />Provides greater amounts of water in the Dove Creek area. <br /> <br />4. Provides treated water to Dove Creek at a probable <br /> <br />cheaper rate. <br /> <br />5. <br /> <br />Raw water reservoir at the treatment plant provides <br /> <br />a readily available reserve in case of emergencies <br /> <br />such as flood, power failure at river pump station, <br /> <br />or break in supply pipeline. <br /> <br />6. <br /> <br />Provide water for the 55 additional families and an <br /> <br />interconnection with the MOntezuma Water Company system. <br /> <br />IV - 5 <br />