Laserfiche WebLink
<br />I <br />I <br /> <br />I <br /> <br />II <br /> <br />I <br /> <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TOWN OF BOONE <br /> <br />WATER SYSTEM IMPROVEMENTS <br />PHASE II - COST ESTIMATE <br /> <br />FEBRUARY 1981 <br /> <br />DESCRIPTION QUANTITY UNIT COST AMOUNT <br /> & UNIT <br />I. 8 Inch PVC, SDR 26 wi 940 LF $ 10.50 9,870 <br /> Fittings <br />2. 6 Inch PVC, SDR 26 wi 8,295 LF 7.75 64,286 <br /> Fittings <br />3. 4 Inch PVC, SDR 26 wi 300 LF 6.50 1,950 <br /> Fittings <br />4. 8 Inch Gate Valve & Box 1 EA 745.00 745 <br />5. 6 Inch Gate Valve & Box 13 EA 575.00 7,475 <br />6. New Fire Hydrant Assembly 16 EA 1,400.00 22,400 <br /> w/Auxiliary Valve <br />7. Relocate Existing Fire 6 EA 500.00 3,000 <br /> Hydrants to New Main <br />8. Connections to Existing Mains 9 EA 800.00 7,200 <br />9. Connect Existing Services to 128 EA 300.00 38,400 <br /> New Main <br />10. Asphalt Pavement Repair 2/1 500 SY 7.25 3,625 <br /> Thick w/prime Coat <br />II. Gravel Road Base Replacement 1,000 SY 4.00 4,000 <br /> 6/1 Thick <br /> <br />CONSTRUCTION TOTAL: <br /> <br />Contingencies: <br />Legal: <br />Engineering, Basic & Special: <br />Construction Inspection: <br />Interest during Construction: <br /> <br />$162,951 <br /> <br />16,2490 <br />4,000 <br />28,200 . <br />9,000 '" <br />5,000' <br /> <br />ir --: <br />. I {,J <br /> <br />({ir /' i: <br />N ~j, \ .-; <br /> <br />WATER SYSTEM PROJECT TOTAL: <br /> <br />$225,400 <br /> <br />-10- <br />