My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00185
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:42:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0002X
Contractor Name
Boone, Town of
Contract Type
Loan
Water District
0
County
Pueblo
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />Other charges imposed by the Town for various services are: <br />$4.25/month sanitation fee (sewer - flat rate) <br />$5.00/month sanitation maintenance charge (sewer - flat <br />rate) <br />$40.00 sewer tap fee <br />$4.45/month refuse collection <br /> <br />It is seen from Table A that present revenues generated from <br />water usage yields approximately $18,700 annually. On the <br />other hand, 1980 annual operation and maintenance expenses for <br />the water system alone were $42,050. It is obvious that with <br />the additional revenue required for operation and maintenance <br />and any increase in indebtedness to construction funding, the <br />water service charge will have to be increased. The increase <br />will have to reflect anticipated loan payments for Phase I <br />construction. <br /> <br />A proposed rate schedule was prepared showing the revenues <br />required to meet the anticipated operation and maintenance <br />budget for Phase I only. Table B shows the anticipated opera- <br />tion and maintenance costs based upon current records. <br /> <br />One of the items which appears excessive is the cost of pur- <br />chased water. It is recommended that the Town consider re- <br />negotiating the water lease to reduce volume and cost to the <br />Town. Presently the water is being purchased at 22~ per 1000 <br />gallons. The present lease does not expire until 1983. <br /> <br />It is also suggested that the tap fee be substantially raised <br />to cover all costs related to installation of the tap plus <br />some reserve. Although Boone is not anticipated to experience <br />any substantial growth in the number of taps in the forseeable <br />future, it is recommended that the tap fee be increased to at <br />least $500.00. <br /> <br />-11- <br />
The URL can be used to link to this page
Your browser does not support the video tag.