My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00185
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:42:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0002X
Contractor Name
Boone, Town of
Contract Type
Loan
Water District
0
County
Pueblo
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />TOWN OF BOONE <br /> <br />WATER SYSTEM IMPROVEMENTS <br />PHASE I - COST ESTIMATE <br /> <br />FEBRUARY 1981 <br /> <br />DESCRIPTION <br /> <br />QUANTITY <br />& UNIT <br /> <br />UNIT COST <br /> <br />AMOUNT <br /> <br />10. <br /> <br />1. <br /> <br />6 Inch PVC, SDR 26 wi 5,200 LF <br />Fittings <br />6 Inch Gate Valve & Box 5 EA <br />New Fire Hydrant Assembly 6 EA <br />wlAuxi1iary Valve <br />Connection to Existing Main 11 EA <br />Connect Existing Services 25 EA <br />to New Main <br />Asphalt Pavement Repair 2" 845 SY <br />Thick wlprime Coat <br />Gravel Road Base Rep1ace- 1,015 SY <br />ment 6" Thick <br />Relocate Existing Fire 2 EA <br />Hydrants to New Main <br />Repair Leaks at Existing ----- <br />Concrete Storage Reservoir <br />Provide Te1emetery Equipment ----- <br />for Storage Reservoir Level <br />Sensor & Provide Gas Chlori- <br />nation Equipment. <br /> <br />$ 7.75 <br /> <br />575.00 <br />1,400.00 <br /> <br />$ 40,300 <br /> <br />2,875 <br />8,400 <br /> <br />8,800 <br />7,500 <br /> <br />6,126 <br /> <br />4,060 <br /> <br />1,000 <br /> <br />3,500 <br /> <br />12,000 <br /> <br />2. <br />3. <br /> <br />4. <br />5. <br /> <br />800.00 <br />300.00 <br /> <br />6. <br /> <br />7.25 <br /> <br />7. <br /> <br />4.00 <br /> <br />8. <br /> <br />500.00 <br /> <br />9. <br /> <br />LUMP SUM <br /> <br />LUMP SUM <br /> <br />CONSTRUCTION TOTAL: <br /> <br />Contingencies: <br />, Legal: <br />Engineering, Basic & Special: <br />Construction Inspection: <br />Interest during Construction: <br /> <br />WATER SYSTEM PROJECT TOTAL: <br /> <br />-9- <br /> <br />$94,561 <br /> <br />9,439 <br />2,500 'r <br />( '.,1" <br />16, 500J ~ ;,~~j:, " <br />5,200 " ,~'" / ' <br />3 , 000 , ' <br />II <br /> <br />$131,200 <br />
The URL can be used to link to this page
Your browser does not support the video tag.