My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00185
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00185
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:11 AM
Creation date
10/5/2006 11:42:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0002X
Contractor Name
Boone, Town of
Contract Type
Loan
Water District
0
County
Pueblo
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
23
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />No unusual construction problems are anticipated during <br />the line construction. The soil is sandy clay underlain <br />with shale. No ground water is expected during construc- <br />tion. <br /> <br />D. Easements and Permits <br />. <br /> <br />All work proposed under Phase I will be constructed in <br />public right-of-ways and no easements or permits are anti- <br />cipated at this time. Phase II work will require a permit <br />to work in State Highways No. 96 and-209. <br /> <br />The project work will require reVlew and approval of the <br />State Health Department as well as any funding agencies <br />offering financial assistance to the project. <br /> <br />5. COST ESTIMATES <br />A separate cost estimate was prepared for Phase I and Phase <br />II construction. This was in anticipation of availability <br />of funds for this fiscal year. Included in the Phase I <br />construction are the costs for the repairs to the collection <br />reservoir and the costs of completing the telemetering equip- <br />ment and gas chlorination equipment. <br /> <br />6. FINANCIAL REQUIREMENTS <br />As previouSly mentioned, the present population of the commu- <br />nity is rather low and the total number of taps served is <br />only 163. In addition, the present monthly service charge <br />for water is: <br />~ $5.00/month minimum for 0-3000 gallons <br />$0.80/1000 gallons over 3000 gallons <br />$100.00 water tap fee <br /> <br />-8- <br />
The URL can be used to link to this page
Your browser does not support the video tag.