Laserfiche WebLink
<br />I. . <br />I <br />1 <br />I <br />1 <br />I <br />1 <br />I <br />I <br />1 <br />1 <br />1 <br />I <br />1 <br />I <br />1 <br />1 <br />1 <br />I <br /> <br />. . <br /> <br />-3- <br /> <br />Task 1: Basin hydrology and analysis <br /> <br />Task 2: "Incremental Damage Assessment" <br /> <br />Task 3: Conceptual design of spillway <br />modifications, and feasibility-level <br />design and cost estimates of pre- <br />ferred alternative modification <br />scheme <br /> <br />Task 4: Phase II work scope finalization <br /> <br />Task 5: Draft report meetings and prepara- <br />tion Of Phase I final feasibility <br />and e~gineering reports <br /> <br />Phase II - Final Design of Spillway Modifications <br /> Task 1: Field explorations <br /> Task 2: Engineering analyses <br /> a) Hydraulic engineering <br /> b) Geologic/geotechnical <br /> epgineering <br /> c) St:ructural engineering <br /> Task 3: Construction drawing preparation <br /> Task 4: Construction specifications <br /> preparation <br /> Task 5: Preparation of Forest Service <br /> permit applications <br />Phase III - Construction services <br /> <br />Task 1: Bid package preparation <br />Task 2: Bid evaluations <br />Task 3 : Construction testing and <br /> observation services <br />Task 4: Special construction consultation <br />Task 5: Preparation of as-builts and <br /> final construction report <br />