My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00179
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00179
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:42:10 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153474
Contractor Name
Oak Creek, Town of
Water District
0
County
Rio Blanco
Bill Number
XB 99-999
Loan Projects - Doc Type
Contract Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
21
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I. <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />. <br /> <br />. <br /> <br />-6- <br /> <br />prepare a draft feasibility report for submission to the CWCB <br />which follows the outline given above, plus any additional <br />reporting requirements specified by the CWCB at the draft <br />report meeting. Following a review of the draft report, we <br />will meet with the CWCB to review their comments and then <br />finalize the report. Significant input will be required by <br />the Town of Oak Creek for preparation of Items 2 and 3, and <br />Chapters I, II, III, VI, and VII of the CWCB feasibility <br />report. The final feasibility and engineering reports will <br />serve as the basis for the final design work. <br /> <br />The CWCB has established general guidelines for the pre- <br />paration of feasibility reports which must be completed for <br />CWCB-funded construction projects. The guidelines indicate <br />that the following items will need to be included in a feasi- <br />bility report for Sheriff Reservoir: <br /> <br />1. Letter of Transmittal <br /> <br />2. Resolution of Applying Organization <br /> <br />3. Reports of Interested ~gencies <br /> <br />4. Chapter I, General Information <br /> <br />5. Chapter II, The District (or other type <br />of organization) <br /> <br />6. Chapter III, Water <br /> <br />a. Water requirements <br />b. Surface water supplY <br />c. Groundwater supply (if applicable) <br />d. Water rights <br />e. Water utilization <br />f. Water quality <br /> <br />7. Chapter IV, Plan of Development (i.e., for <br />this project, this chapter will be Plan of <br />Dam Safety Modifications) <br /> <br />a. Physical plan <br />b. Geologic and geotechnical investigations <br />c. Design <br />d. Structure plans <br />e. Permits <br /> <br />8. Chapter V, Estimated Costs <br /> <br />a. Costs of construction <br />b. Fund requirement schedule <br />c. Emergency operating fund <br />
The URL can be used to link to this page
Your browser does not support the video tag.