My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00169
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00169
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:10 AM
Creation date
10/5/2006 11:41:24 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0013X
Contractor Name
Wadley Farms Homeowners Association
Contract Type
Loan
Water District
0
County
Adams
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
166
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />Feasibility Study <br />Wadley FamlS HOA <br />January 06, 1996 <br />9 <br /> <br />D. Description of Selected Project <br /> <br />1 Water Rights <br /> <br />The Wadley Farms HOA owns 3 shares of Farmers' High Line Canal, shares of Signal <br />Ditch, and senior reservoir fill priorities as described in Appendix E. <br /> <br />2 Preliminary Design and Layout <br /> <br />The preliminary design of dam rehabilitation is described in the report prepared by <br />Rocky Mountain Consultants presented in Appendix F. As a part of this project, the <br />Wadley Farms HOA retained Hadley & Hollingsworth to prepare a geotechnical study <br />and specifications for construction of Wadley Reservoir No.3 (Appendix K). <br />Construction on tIns reservoir commenced in the Fall of 1995 and is how substantially <br />complete as described in the completion report (Appendix L). The Wadley Farms <br />HOA has expended approximately $54,000 and $15,000 on construction and <br />engineering services, respectively. <br /> <br />Costs to rehabilitate pump controls are estimated at $25,000 (Appendix M), Costs to <br />replace leaking valves and appurtenances in the distribution system are estimated at <br />$25,000. <br /> <br />3 Narrative Description <br /> <br />This project will consist of deepening Wadley Reservoir Nos. 1,2, and 3 by <br />excavation, Embankment crest widths and side slopes are to be improved to meet or <br />exceed current standards. Seepage problems are to be substantially reduced. Pumps <br />and motors that have deteriorated will be improved and flow meters installed. Pump <br />control and telemetry systems will be installed. Leaks in the distribution system will be <br />repaired, <br />
The URL can be used to link to this page
Your browser does not support the video tag.