Laserfiche WebLink
<br />, ) <br /> <br />Feasibility Study <br />Wadley Fanns HOA <br />January 06, 1996 <br />10 <br /> <br />4. Cost Estimates <br /> <br />Planning Cost <br />Preliminary cost estimates by Rocky Mountain Consultants <br />Services of 2 Wadley resident water resources engineers <br />(but no charge to the HOA) <br /> <br />Constmction Cost (Appendix F) <br />Reservoir NO.1 $264,000 <br />Reservoir No, 2 $537,000 <br />Reservoir NO.3 $122,100 <br />Distribution system repair $ 25,000 <br />(Above costs include engineering, 25% contingency, and new pump controls) <br /> <br /> <br />$6.jDO__._ <br />(Pficelesv <br /> <br />Total Cost <br /> <br />$954,600 <br /> <br />AnnuaIO,M&R <br /> <br />$15,000 <br /> <br />5. Implementation Schedule <br /> <br />The following preliminary schedule is proposed for the project. Many factors could <br />delay the schedule and it is therefore subject to revision. <br /> <br />Complete Final Design <br />Project Bidding <br />Award Bid <br />Start Construction <br />Complete Construction <br />Project is Operational <br /> <br /> <br />..e--- <br />r <br />~ <br />r <br /> <br />July 1996 <br />September 1996 <br />October 1996 <br />October 1996 <br />May 1997 <br />June 1997 <br /> <br />) <br />(lJf ~ I.J; <br />1r)~ <br />