Laserfiche WebLink
<br />3. Require all Subcontractors to indemnify the State and <br />the Contractor against all liability and loss, and against all <br />claims and actions based upon or arising out of damage or <br />injury, including death, to persons or property caused by or <br />sustained in connection with the performance of any subcontract <br />or by conditions created thereby, or based upon any violation <br />of any statute, ordinance, or regulation, and the defense of <br />any such claims or actions. <br /> <br />4. Require all Subcontractors to maintain liability <br />insurance in at least the following amounts: <br /> <br />a. For any injury to one person in any single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars ($1S0,000). <br /> <br />b. For any injury to two or more persons in any <br />single occurrence, the sum of Four Hundred Thousand <br />Dollars ($400,000). <br /> <br />Said liability insurance shall name the Contractor and <br />the State as co-insureds. No payments shall be made under this <br />contract unless a copy of a certificate of said liability <br />insurance has been filed with the Colorado Water Conservation <br />Board. <br /> <br />5. Conveyor cause title to be conveyed by warranty deed <br />to the Colorado Water Conservation Board, Department of Natural <br />Resources, State of Colorado, the following portions of the <br />proposed project facilities within thirty (30) days of their <br />comple t ion: <br /> <br />An undivided fifty percent (50%) of the following: <br /> <br />a. Two hundred twenty-five thousand plus or minus <br />(225,000+) cubic yards of earthfill in the core, <br />embankment, and breach between Stations 0+00 and <br />39+75. <br /> <br />b. Twenty-seven thousand eight hundred ten plus or <br />minus (27,810+) tons of riprap in the main embankment <br />between Stations 0+00 and 39+75, <br /> <br />c. Eleven thousand three hundred fifty plus or minus <br />(11,350+) tons of gravel for pit run and road surface <br />in the main embankment between Stations 0+00 and <br />39+75. <br /> <br />d. Three hundred fourteen plus or minus (314+) cubic <br />yards of reinforced concrete in the outlet works at <br />Station 19+44. <br /> <br />e. Two hundred twenty-nine plus of minus (229+) linear <br />feet of 54-inch reinforced concrete pipe in the outlet <br />works at Station 19+44. <br /> <br />f. Three stop logs in the outlet works at Stat ion <br />19+44. <br /> <br />g. One hundred forty plus or minus (140+) square feet <br />of trash racks in the outlet works at Station 19+44. <br /> <br />h. A fourteen-by-eleven-foot building, eight feet <br />high, to be located in th outlet works at Station <br />19+44. <br /> <br />i. Two 36-inch-square cast iron slide gates in the <br />outlet works at Station 19+44. <br /> <br />page 2 of 8 Pages <br />