Laserfiche WebLink
<br />.:~ <br /> <br /> <br />Form 6.AC.02A <br /> <br />DEPI \tENT OR AGENCY NUMBER <br />",-04-00 <br />CONTRACT RpUTING NUMBER <br /><t,~O <br />$2,057,000 <br /> <br />CONTRACT <br /> <br />THIS CONTRACT, made this 1st day of May <br />Stale of Colorado for the use and benefit of the Department of ., <br />(Colorado Water Conservation Board)k <br />hereinafter referred to as the State, and '2 t;lhe North poudre Irriaa tion <br />P. O. Box 100. Wellinaton. Colorado 80549. <br />hereinafter referred to as the contractor. <br /> <br />1982, by and between the <br />Natural Resources <br /> <br />Company, <br /> <br />WHEREAS, authority exists in the Law and Funds have been budgeted. appropriated and otherwise made <br />available and a sufficient unencumbered balance thereof remains ava~ble fo~~ment in Fund Number 4008 <br />G/L Account Number Sf) lOx Contract Encumbrance Number~ <:33 ~nd <br />ABL Account Number 16101, Org, Unit 77-77-777, <br />WHEREAS, required approval, clearance and coordination has been accomplished from and with appropriate <br />agencies; and <br /> <br />WHEREAS, pursuant to the provisions of 37-60-119, Colorado <br />Revised Statutes 1973, as amended, the State is authorized to <br />construct certain water projects for the benefit of the people <br />of the State; and <br /> <br />WHEREAS, the Contractor is a duly constituted irrigation <br />company in the State of Colorado and wishes to repair the <br />Fossil Creek Reservoir, hereinafter called the project, for the <br />stockholders of the North poudre Irrigation Company in Larimer <br />County, Colorado, at an estimated cost of Four Million One <br />Hundred Fourteen Thousand Dollars ($4,114,000); and <br /> <br />WHEREAS, a feasibility investigation of said project was <br />conducted and it was found that such a project is economically <br />feasible; and <br /> <br />WHEREAS, the State has agreed to construct said project and <br />to sell the same to the Contractor upon mutually agreeable <br />terms and conditions, subject to the availability of funding <br />for that purpose: and <br /> <br />WHEREAS, pursuant to Senate Bill No. 87, Fifty-Third <br />General Assembly of the State of Colorado, duly.enacted into <br />law, the Colorado Water Conservation Board has been authorized <br />to expend a sum not to exceed Two Million Fifty-Seven Thousand <br />Dollars ($2,057,OOO) for construction of the project; <br /> <br />NOW THEREFORE, in consideration of the mutual and <br />dependent covenants herein contained, it is agreed by the <br />parties hereto as follows: <br /> <br />A. The Contractor agrees that it shall: <br /> <br />1. Employ an engineering firm to prepare project plans <br />and specifications for the proposed project. Both the <br />engineering firm and the project plans and specifications shall <br />be approved by the State, <br /> <br />2. Subcontract the construct ion of said project to a <br />responsible and capable firm, said project to be completed <br />within two (2) years of the date of this contract in accordance <br />with the project plans and specifications and any necessary <br />modification thereof approved by the State. The State must <br />approve, in writing, all subcontracts before they become <br />effective. The above-mentioned time may be extended by the <br />State if such time is insufficient because of acts of God or <br />other acts or circumstances beyond the control of the <br />Contractor. <br /> <br />395-53-o1-C010 <br /> <br />Page 1 of ~ pages <br />-(See inslructions on ,everse of lasl page.) <br /> <br />dl0l <br />n/poudre <br />