Laserfiche WebLink
<br />j. Four hundred ninety-nine plus or minus (499+) <br />cubic yards of concrete in the spillway between- <br />Stations 51+50 and 69+40. <br /> <br />k. Eighteen thousand plus or minus (18,000+) cubic <br />yards of earthfill in the spillway between Stations <br />51+50 and 69+40. <br /> <br />1. Twenty-three plus of minus (23+) acres of land for <br />right-of-way in the spillway between Stations 51+50 <br />and 69+40. <br /> <br />m. Thirty-three thousand plus or minus (33,000+) <br />cubic yards of earthfill in the north freeboard-dike <br />between Stations 0+00 and -20+00. <br /> <br />n. Two point seven plus or minus (2.7+) acres of land <br />for right-of-way in the north freeboard dike between <br />Stations 0+00 and -20+00. <br /> <br />All of the above are located in the general Fossil <br />Creek Dam area; more details for the exact location can be <br />found in Appendices A, B, and C. <br /> <br />The warrranty deed must be recorded by the Contractor <br />in the proper county or counties and all transfer taxes shall <br />be paid by the Contractor. <br /> <br />6. Permit periodic inspection of construction by <br />authorized representatives of the State during and after <br />construction. <br /> <br />7. Without expense to the State, manage, operate, and <br />maintain the project system continuously in an efficient and <br />economical manner, and assume all legal liability for such <br />management, operation, and maintenance. The Contractor shall <br />maintain generai liability insurance covering its management, <br />operation, and maintenance of the project system until it has <br />completed purchase of the project system from the State in at <br />least the following amounts: <br /> <br />a. For any injury to one person in any single <br />occurrence, the sum of One Hundred Fifty Thousand <br />Dollars ($150,000), <br /> <br />b. For any injury to two or more persons in any <br />single occurrence, the sum of Four Hundred Thousand <br />Dollars ($400,000), <br /> <br />Said liability insurance shall name the State as a <br />co-insured. A copy of a certificate of said liability <br />insurance must be filed with the Colorado Water Conservation <br />Board prior to the start of the operation of the project <br />system. <br /> <br />8. Make the services of said project available within its <br />capacity to all persons in the Contractor's service area <br />without discrimination as to race, color, religion, or natural <br />origin at reasonable charges including assessments, taxes, or <br />fees in accordance with a schedule of such charges, whether for <br />one or IOC>re classes of service, formally adopted by the <br />Contractor through its board of directors, as may be modified <br />from time to time by the Contractor. The initial rate schedule <br />must be approved by the State. Thereafter, the Contractor may, <br />subject to the approval of the State, make such rodifications <br />to the rate schedule as the Contractor deems necessary to <br />efficiently and economically provide for the financial <br />requirements of the system as long as the rate schedule remains <br />reasonable and non-discriminatory. <br /> <br />Page 3 of 8 Pages <br />