My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00151
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:00 AM
Creation date
10/5/2006 11:40:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153449
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />~'; <br /> <br />~-i-,! <br /> <br />STATE OF COLORADO <br />~ <br /> <br />COLORADO WATER CONSERVATION BOARD <br />Department of Natural Resources <br /> <br />)21 Stat. C.nt.nnlol Building <br />1313 Sherman Street <br />Denver, Colorado 80203 <br />Phon.: (03) 866-3441 <br /> <br />[/1. <br /> <br />7 <br /> <br />v'- <br /> <br /> 4. <br />It <br /> 5. <br /> V <br /> 6. <br />1 <br /> <br />Richard o. lamm <br />Governor <br /> <br />October 19, 1984 <br /> <br />J. william McDonald <br />.Director <br /> <br />David W. Walker <br />Deputy Director <br /> <br />Ms. Jackie Malcolm, P. E. <br />Bruns Associates, Inc. <br />16 Mountain View Avenue <br />Longmont, CO 81501 <br /> <br />Re: Feasibility Report fo~ the North poudre Irrigation <br />Company's Reservoir N0. 15 Dam Rehabilitation Project <br /> <br />Dear Ms. Malcolm: <br /> <br />We have reviewed the preliminary draft of the subject report <br />and offer the following comments: <br /> <br />On page 6: expand the land classification section to include <br />the general Soil Conservat:lon Service land classes. <br /> <br />2. Chapter IV needs to includ~ a statement on the "Safe Yield" <br />of the company's water rights and an analysis of the <br />reservoir operation. <br /> <br />On'page 12: state which embankment designs had stability <br />analyses and show the results of such analyses. <br /> <br />On page 15: we feel the inflation factor for 1986 <br />construction should only be 10-15% instead of the 20% shown. <br /> <br />Explain why the new 42" outlet cost was used in all of the <br />cost estimates in lieu of the "Repair Existing Outlet" cost. <br /> <br />In Chapter VIII: you need to justify your assumptions of <br />future storage restrictions on the reservoir storage and on <br />the $1850.00 value per acre foot of storage. The cost <br />benefit shown could change dramatically if your assumptions <br />cannot be justified. Also, 'in the last paragraph on page 24 <br />explain how these costs relate to cost per acre foot of <br />water. <br /> <br />717 <br />jk/ml <br />
The URL can be used to link to this page
Your browser does not support the video tag.