Laserfiche WebLink
<br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br />I <br /> <br />CONSTRUCTION ESTIMATE <br /> <br />REPAIR EXISTING OUTLET <br /> <br /> UNIT <br />ITEM DESCRI PTI ON QUANTITIY UNITS PRICE AMOUNT <br />1. Reline Existing Conduit 242 L.Ft . 400.00 96,800.00 <br />2. New Inlet Struct. Concrete 30 Cu. Yd. 500.00 15,000.00 <br />3. New 8' Parshall Flume 20 Cu.Yd. 500.00 10,000.00 <br />4. New Drop Basin Floor & Lip 20 Cu.Yd. 500::00 10,000.00 <br />5. New Stem Guides 5 Each 1,000.00 5,000.00 <br /> <br />Total Estimate to Repair Existing <br />Conduit for 3:1 Slope <br /> <br />$ 114,300.00 <br /> <br />For 31,:1 Slope <br />6. Add Conduit - 41 L.Ft. <br /> <br />300.00 12,300.00 <br /> <br />Total for 31,:1 Slope <br /> <br />$ 126,600.00 <br /> <br />For 4:1 Slope <br />7. Add Conduit <br /> <br />1\7 L.Ft. <br /> <br />300.00 14,100.00 <br /> <br />Total For 4:1 Slope <br /> <br />$ 128,400.00 <br /> <br />17 <br />