Laserfiche WebLink
<br />I <br /> CONSTRUCTION ESTIMATE <br />I NEW 42" OUTLET <br /> UNIT <br />I ITEM DESCRIPTION QUANTITY UNITS PRICE AMOUNT <br /> 1. Inlet Struct. Concrete 42 Cu.Yd. 400.00 16,800.00 <br />I 2. Trash Racks 1 L. S. 10,000.00 10,000.00 <br /> 3. J.2" Slide Gate 1 L. S. 4,000.00 4,000.00 <br />I 4. 42" Slope Face Gate 1 L.S. 27,000.00 27,000.00 <br /> 5. 42" Reinf. Concrete Pipe 260 L. Ft. 200.00 52,000.00 <br />I 6. 30" Slide Gates 2 Each J.8,000.00 36,000.00 <br />7. Tower Concrete 80 Cu.Yd. 500.00 40,000.00 <br />I 8. Energy Dissipator Concrete 42 Cu.Yd. 500.00 21,000.00 <br />9 . Drop Check - Concrete 30 Cu.Yd. 500.00 15,000.00 <br />I 10. 8' Parshall Concrete 12 Cu.Yd. 500.00 6,000.00 <br />11. Anti-Seep Collars Concrete 12 Cu. Yd. 500.00 6,000.00 <br /> 12. Pipe Cradle 125 CU.Yd. 400.00 50,000.00 <br />I 13. Gate I.louse Building 1 L. S. 10,000.00 10,000.00 <br /> 14. Steel Liners 1 L. S. 20,000.00 20,000.00 <br />I IS. Electrical and Controls 1 L. S. 50,000.00 50,000.00 <br />I Total Alternate for 3:1 Slope $ 363,800.00 <br />I For 3~i: 1 Upstream Slope <br /> 16. Add 42" RCP 18 Pt. 200.00 3,600.00 <br />I 17. Add Cradle Concrete 9 Cu.Yd. 400.00 3,600.00 <br />18. Add Slope Face Gate <br /> Additional Stem, cas1ng, etc. 1 L. S. 2,000.00 2,000.00 <br />I $ 373,000.00 <br /> Total Alternate for 3~:1 Slope <br />I For 4:1 Upstream Slope <br />I I'l. Add 42" RCP 38 Ft. 200.00 7,600.00 <br />20. Add Cradle Concrete 18 Cu.Yd. 400.00 7,200.00 <br /> 21. Add Slope Face Gate <br />I Additional Stem, Casing,etc. 1 L. S. 4,000.00 4,000.00 <br />I Total Al terna'te for 4:1 Slope $ 382,600.00 <br />I 18 <br />