My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00151
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:00 AM
Creation date
10/5/2006 11:40:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153449
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> CONSTRUCTION ESTIMATE <br />I NEW 42" OUTLET <br /> UNIT <br />I ITEM DESCRIPTION QUANTITY UNITS PRICE AMOUNT <br /> 1. Inlet Struct. Concrete 42 Cu.Yd. 400.00 16,800.00 <br />I 2. Trash Racks 1 L. S. 10,000.00 10,000.00 <br /> 3. J.2" Slide Gate 1 L. S. 4,000.00 4,000.00 <br />I 4. 42" Slope Face Gate 1 L.S. 27,000.00 27,000.00 <br /> 5. 42" Reinf. Concrete Pipe 260 L. Ft. 200.00 52,000.00 <br />I 6. 30" Slide Gates 2 Each J.8,000.00 36,000.00 <br />7. Tower Concrete 80 Cu.Yd. 500.00 40,000.00 <br />I 8. Energy Dissipator Concrete 42 Cu.Yd. 500.00 21,000.00 <br />9 . Drop Check - Concrete 30 Cu.Yd. 500.00 15,000.00 <br />I 10. 8' Parshall Concrete 12 Cu.Yd. 500.00 6,000.00 <br />11. Anti-Seep Collars Concrete 12 Cu. Yd. 500.00 6,000.00 <br /> 12. Pipe Cradle 125 CU.Yd. 400.00 50,000.00 <br />I 13. Gate I.louse Building 1 L. S. 10,000.00 10,000.00 <br /> 14. Steel Liners 1 L. S. 20,000.00 20,000.00 <br />I IS. Electrical and Controls 1 L. S. 50,000.00 50,000.00 <br />I Total Alternate for 3:1 Slope $ 363,800.00 <br />I For 3~i: 1 Upstream Slope <br /> 16. Add 42" RCP 18 Pt. 200.00 3,600.00 <br />I 17. Add Cradle Concrete 9 Cu.Yd. 400.00 3,600.00 <br />18. Add Slope Face Gate <br /> Additional Stem, cas1ng, etc. 1 L. S. 2,000.00 2,000.00 <br />I $ 373,000.00 <br /> Total Alternate for 3~:1 Slope <br />I For 4:1 Upstream Slope <br />I I'l. Add 42" RCP 38 Ft. 200.00 7,600.00 <br />20. Add Cradle Concrete 18 Cu.Yd. 400.00 7,200.00 <br /> 21. Add Slope Face Gate <br />I Additional Stem, Casing,etc. 1 L. S. 4,000.00 4,000.00 <br />I Total Al terna'te for 4:1 Slope $ 382,600.00 <br />I 18 <br />
The URL can be used to link to this page
Your browser does not support the video tag.