My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00151
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00151
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:02:00 AM
Creation date
10/5/2006 11:40:41 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
C153449
Contractor Name
North Poudre Irrigation Company
Contract Type
Loan
Water District
3
County
Larimer
Bill Number
HB 85-1042
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
159
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br />I <br /> <br />I <br /> <br />CHAPTER VI - ESTIMATED COSTS <br /> <br />I <br /> <br />COST OF CONSTRUCTION <br /> <br />I <br /> <br />Included within this report is a delineation of specific construc- <br />tion items contemplated for this project. Each of these are listed <br />separetly with the associated quantities, units, and estimated unit <br />price. The unit prices applied to tbese were derived from past <br />experience in bidding projects similar in nature. <br /> <br />I <br /> <br />I <br /> <br />These construction prices anticipate normal contractual arrangements <br />with contractors, and a reasonable construction schedule established <br />to allow good weather. Were construction to be required over the <br />winter months, these items may be increased. <br /> <br />I <br /> <br />I <br /> <br />I <br /> <br />Due to the fact that actual construction 1S not contemplated until <br />1986, an inflation factor of 20% above the estimated construction <br />items has been included. <br /> <br />I <br /> <br />Contingencies, legal, <Jnd enginceting has bcen provided for by add- <br />ing an additional 30% to the estimated construction costs. <br /> <br />I <br /> <br />I <br /> <br />PUND REQUIREMENT SCHEDULE <br /> <br />I <br /> <br />^ fund requircment schedule has been prepared for this project and <br />is included therein. This fund rcquirement schedule commences with <br />the present Feasibility Study, and includes design of the repairs <br />in 1985 and anticipated completion of construction 1986. <br /> <br />I <br />I <br />I <br />I <br /> <br />QPERATION, MAINTENANCE, AND REPL^CEMENT COSTS <br /> <br />The North Poudre Irrigation Company is a present operating entity <br />and the cost of operation and maintenance of Reservoir No. 15 as <br />an existing facility is approximately the same whether the reservoir <br />is filled to 75% full or 100% full. <br /> <br />I <br /> <br />I <br /> <br />Included within the annual report of The North Poudre Irrigation <br />Company and included in Appendix "G" herein, is a full operation <br />and maintcnance cxpcnsc buuget for the company for 1982 anu 1983. <br /> <br />16 <br />
The URL can be used to link to this page
Your browser does not support the video tag.