My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PROJ00149
CWCB
>
Loan Projects
>
Backfile
>
1-1000
>
PROJ00149
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/19/2009 11:43:09 AM
Creation date
10/5/2006 11:39:32 PM
Metadata
Fields
Template:
Loan Projects
Contract/PO #
FS0033X
Contractor Name
Fruitland Mesa Project 1960
Contract Type
Miscellaneous
Water District
0
County
Gunnison
Loan Projects - Doc Type
Feasibility Study
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
156
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
<br /> <br />. <br /> <br />SUMMARY SHEETS (Continued) <br /> <br />COSTS <br /> <br />Construction Costs!! (July 1959 prices) <br />Soap Park Dam and Reservoir . $8,000,000 <br />Crystal Creek Diversion Dam . . . . . 305,000 <br />Curecanti Creek Diversion Dam . .. 85,000 <br />Black Mesa Conduit ..... 14,350,000 <br />Fruitland Canal . . . . . . . . . 3,070,000 <br />Gould Canal structure improvements 540,000 <br />Laterals ............ .. .. .. .. .. .. .. 420,000 <br />Drains ............................ _ 100,000 <br />Crystal Creek channel protection . . g!70,00( <br />Operation and maintenance headquarters . 60,000 <br />Recreational facilities . . . .. 100,000 <br />Transitional development . . . . . . . . . . 25,000 <br />Total .. .. .. .. .. .. .. .. .. .. .. .. .. .. 27,125,000 <br />2J Includes expenditure of $333,000 for investigations prior to <br />authorization, including $178,000 from nonreimbursable funds and <br />$155,000 from reimbursable funds. <br />g; Costs for 2 miles of channel protection. Costs for additional <br />0.7 mile are included in estimate for Black Mesa Conduit. <br /> <br />. <br /> <br />Annual Operation and Maintenance Costs (1957-59 prices) <br /> <br />. <br /> <br />46,000 <br /> <br />IRRIGATION <br /> <br />Supplemental <br />service lands <br /> <br />Full <br />service lands <br /> <br />Total <br /> <br />Project area (acres) <br />Irrigable acreage <br />Class 2 <br />Class 3 <br />Class 4 <br />Subtotal <br /> <br />Nonirrigable acreage <br />Farm units <br />Fringe and isolated <br />Subtotal <br />Total <br /> <br />3,570 <br />1,800 <br />1,560 <br />6,930 <br /> <br />6,310 <br />8,010 <br />2,200 <br />16,520 <br /> <br />9,880 <br />9,810 <br />3,760 <br />23,450 <br /> <br />areas <br /> <br />25,415 <br />6,460 <br />31,1375 <br />55,325 <br /> <br />. <br /> <br />Elevation of project lands (feet msl). . . . . . . . . . <br />Frost-free period (avg. days annually) . . . . . . . . <br />Consumptive use (ac.-ft. per productive ac. annually). <br />Ideal diversion requirement (avg. ac.-ft. annually) <br />Per productive acre .. .. .. .. .. .. .. .. .. .. .. .. .. <br />Total .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. .. <br />Water within ideal requirement (avg. ac.-ft. annually) <br />Without project . . . . <br />Proj ect increase .... .. .. .. .. .. .. .. .. .. .. .. <br />Total with project .. .. .... .... ................ <br />Increased depletions of Colorado River (ac.-ft. annually). <br /> <br />. <br /> <br />.6,600-8,000 <br />135 <br />1.78 <br /> <br />3.70 <br />81,400 <br /> <br />. <br /> <br />. <br /> <br />17 ,900 <br />58,500 <br />76,400 <br />28,100 <br /> <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.